Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Model No.: Wind Power
Brand: QRE - QIANCHAO
Packaging: Seaworthy Packing
Productivity: 500 Sets / year
Transportation: Ocean
Place of Origin: China
Supply Ability: High
Certificate: ISO
HS Code: 85042100;85042200
Port: China Sea Port
Payment Type: L/C,T/T
Incoterm: FOB,CFR,CIF
Part I: Product Overview
With the continuous development of social economy, the conception of environment friendly has gradually become more and more popular currently. Wind power market is booming, leading to the rapid development of substation for new energy power market. QRE has digested and absorbed the advanced technology at home and abroad, and self-designed and self-developed the 35kV wind Power Transformer and Prefabricated Substation combined with the domestic and international market demand. This series of product is a whole set of substation including transformer, HV part, LV part and other auxiliary equipment in a common enclosure passed the type test. The structure of product combines the advantages of European style substation and American style substation. It's new step up equipment specially designed for the particularity with the advantages of strong complete set, easy for installation, short construction period, low operating cost, high structural strength, excellent anticorrosive property, environment friendly and so on.
Part II: Product Features
The wind power step up substation with its compact and reasonable system layout, including LV incoming cubicle, transformer and HV incoming cubicle which are independently installed in three compartments, are arranged into coupled [F" type or "L" type, fully featured and easily maintained. The LV compartment is equipped with remote device and power supply transformer to realize the remote control and self power supply, meeting the need of system of wind power.
1. The wind power step up prefabricated substations includes LV incoming cubicle, transformer and HV incoming cubicle which are independently installed in three compartments, are arranged into coupled "F". The LV compartment is equipped with remote device and power supply transformer to realize the remote control and self power supply. 35kV HV switch-disconnectors and fuse-combination units placed in two different rooms solves the problem that when to replace the switch, fuse or arc-chute, the whole line need to be shut down.
2. The wind power step up pad-mounted substations includes the LV incoming cubicle, transformer and the HV load switch and fuse installed inside the transformer tank. The arrangement of the whole set is divided into "L" type and coupled "F" type. The LV compartment is equipped with remote device and power supply transformer to realize the remote control and self power supply. As there is no transformer room, the whole set covers relatively less area, less cost and reduces the investment of user.
3. Adopted the radiator installed in open, achieved the heat dissipating performance of fully air natural ventilation which saves the power loss caused by air forced ventilation, avoids the defect of over temperature trip caused by the unreliable performance of fans in air forced ventilation, makes all the live parts fully sealed in the substation, and realizes the dust-proof.
4. "Five proof" functions completed, easy to make operation and maintenance, meeting the requirement of check and maintenance in rainy days.
Description | Model | Voltage | No Load Loss (kW) | Load Loss (kW) | No-load Current (%) | Short-circuit Impedance (%) | Oil Weight (kg) | |
H.V(kV) | L.V(kV) | |||||||
35kV wind power combined transformer | ZGS11-Z.F-630/35 | 35 | 0.69 | 0.830 | 7.86 | 0.65 | 6.5 | 1380 |
ZGS11-Z.F-800/35 | 0.980 | 9.40 | 0.65 | 6.5 | 1480 | |||
ZGS11-Z.F-1000/35 | 1.15 | 11.5 | 0.65 | 6.5 | 1600 | |||
ZGS11-Z.F-1250/35 | 1.40 | 13.9 | 0.60 | 6.5 | 1710 | |||
ZGS11-Z.F-1600/35 | 1.69 | 16.6 | 0.60 | 6.5 | 1920 | |||
ZGS11-Z.F-2000/35 | 1.99 | 19.7 | 0.55 | 6.5 | 2010 | |||
ZGS11-Z.F-2500/35 | 2.36 | 23.2 | 0.55 | 6.5 | 2130 | |||
ZGS13-Z.F-630/35 | 0.665 | 7.86 | 0.65 | 6.5 | 1380 | |||
ZGS13-Z.F-800/35 | 0.790 | 9.40 | 0.65 | 6.5 | 1480 | |||
ZGS13-Z.F-1000/35 | 0.920 | 11.5 | 0.65 | 6.5 | 1600 | |||
ZGS13-Z.F-1250/35 | 1.120 | 13.9 | 0.60 | 6.5 | 1710 | |||
ZGS13-Z.F-1600/35 | 1.350 | 16.6 | 0.60 | 6.5 | 1920 | |||
ZGS13-Z.F-2000/35 | 1.590 | 19.7 | 0.55 | 6.5 | 2010 | |||
ZGS13-Z.F-2500/35 | 1.890 | 23.2 | 0.55 | 5.0 | 2130 |
Part IV: Outline Drawing
Product Categories : Compact Substation > Wind Power Substation
Mr. James
Tel:
86-0571-82583721
Fax:
E-mail:
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.