Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Azerbaijan’s largest utility Azerenergy has announced the construction of two 110/35/1-substations in the Aghdam region.
The construction of the substations has to do with the region’s size and the scale of infrastructure projects in Aghdam.
The Aghdam-1 substation is being built at the entrance to the regional centre, near the former bus station, while the Aghdam-2 substation is being built toward the Shelly settlement near Askeran.
Moreover, a double-circuit 110 kV high-voltage power line is being laid to these substations 40km off the Khindiristan substation.
Likewise, Azerenergy’s Karabakh Regional Control Center is being built near the Aghdam-1 substation, where the most modern digital equipment for automatic control of the liberated territories will be installed.
The work on the substation Aghdam-1 is being carried out at an accelerated pace. Meanwhile, most of the work at the Aghdam-2 substation has already been completed and the construction is nearing completion.
Additionally, in the coming months, it is planned to complete the construction of a 110 kV power transmission line, including the Aghdam-1 and Aghdam-2 substations, as well as the Karabakh Regional Control Center.
Source: Azer News
July 08, 2021
July 03, 2021
A power transformer is a static electrical device that is used to change a certain value of an ac voltage (current) to another value or values of a different voltage (current) at the same frequency....
Yantai Electric Power Company Zhaoyuan wind farm box change technical transformation work completed on July 27, which lasted 7 days, complete box change made 29 units, 4 days earlier than planned...
Probe current voltage pin 420*4450 head diameter 5.0 over current current and voltage pin Shunluo Inductance Power Inductor SWPA Series First Class Agent MOS power IC full range 1.5PF SOT23-6 Low...
A 110 kV type 10 green environmental protection power transformer researched and developed by Gansu Power Transformer Factory has recently passed the inspection test of the National Transformer...
Email to this supplier
July 08, 2021
July 03, 2021
September 15, 2022
September 15, 2022
Mr. James
Tel:
86-0571-82583721
Fax:
E-mail:
Related Products List
Mobile Site
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.